020-222 practice question 9 of 15

In developing an emergency plan, program administrators must take into account all of the following factors EXCEPT

Full set: 75 questions
Answer options
A: Type of flooring.
B: Type of electrical wiring. Correct answer
C: Ventilation, temperature, and humidity.
D: Types of exercise equipment.
Correct Answer:
B. Type of electrical wiring.
Explanation

When developing an emergency plan, administrators must consider factors that directly influence potential emergencies and the response to them. This includes flooring type (slip/fall risk), ventilation/temperature (risk of heat-related illness), and types of equipment (risk of mechanical failure or user injury). The specific type of electrical wiring, however, is a building design and code compliance issue established during construction. While the emergency plan must address electrical emergencies (e.g., fire, power failure), it focuses on the response protocol, not the technical specifications of the pre-existing, static infrastructure like the gauge or material of the wiring.

Why Incorrect

A. Flooring type is a critical factor as it relates directly to the risk of slips, trips, and falls, a common cause of injury.
C. Ventilation, temperature, and humidity are crucial environmental factors that can cause or exacerbate medical emergencies like heat stroke.
D. The types of exercise equipment directly dictate potential injuries (e.g., crushed fingers in weight stacks) and necessary emergency responses.

References

1. American College of Sports Medicine. (2018). ACSM's Health/Fitness Facility Standards and Guidelines (5th ed.). Human Kinetics. (Chapter 10, Emergency Procedures, outlines key considerations for an emergency plan, focusing on response actions, personnel roles, facility layout, and equipment, rather than building construction specifications like wiring type).

2. National Fire Protection Association. (2021). NFPA 70: National Electrical Code. (The type of wiring is governed by building and electrical codes to prevent emergencies, but is not a variable in the development of the response plan itself).

3. Tharrett, S. J. (2018). Risk Management and Emergency Preparedness. In J. L. Van der Smissen, B. A. van der Smissen, & S. J. Tharrett (Eds.), ACSM's Health/Fitness Facility Standards and Guidelines (5th ed., pp. 91-102). Human Kinetics. (The chapter emphasizes foreseeable risks from activities and environment, not underlying construction specs).

Scroll to Top