1Z0-076 practice question 14 of 25
Your Data Guard environment contains a four-instance RAC primary database whose SID is PROD and a RAC physical standby database whose std is…
Full set: 107 questionsThe OLTPWORKLOAD service is already created and started on the primary.
1) The same service must exist on the physical standby and be marked –role PRIMARY so that it will start automatically when that standby becomes the primary.
4) Client connect strings must be changed (or verified) so that they use the OLTPWORKLOAD service; then OCI will transparently request TAF using the server-side failover attributes specified with srvctl. No DBMSSERVICE call is needed, and no special TNS entry beyond pointing to the service is required.
A. Step 4 alone does not create the service on the standby, so TAF cannot start there.
B. Uses DBMSSERVICE rather than srvctl and omits creating the service on the standby cluster; incomplete.
C. Only creates the service on the standby; primary and clients remain unprepared.
E. Defines TNS names but never creates service on standby, so failover fails.
F. Adds service on standby but omits ensuring clients actually use it.
1. Oracle Grid Infrastructure & RAC Admin Guide 19c, Sec. 6.3.4 “Creating Role-based Services with SRVCTL” (E96216-29, p. 6-19).
2. Oracle Database Net Services Administrator’s Guide 19c, Sec. 10.2 “Transparent Application Failover with Server-Side Configuration” (E96243-24, p. 10-3).
3. Oracle Maximum Availability Architecture—“Data Guard Services Best Practices for RAC” white paper, v19c, p. 14-15 (Oracle Corp.).
Keep practicing
Take the free 1Z0-076 practice test
Ten exam-style questions with answers and explanations, plus the exam facts and study guides.
More questions
Other 1Z0-076 practice questions
- Question 2You created two remote physical standby databases using SQL and RMAN. The primary databas…
- Question 3Examine the Data Guard configuration: DGMGRL> show configuration; Configuration - Animals…
- Question 4Your expertise is requested for these customer requirements: The Data Guard environment m…
- Question 5Which THREE steps are prerequisites for the creation of a physical standby database on a …
- Question 6You must design an Oracle Data Guard configuration for a DSS database that meets these pe…
- Question 7Which THREE are among the various tasks performed by the Data Guard Monitor (DMON) proces…
