1Z0-1042-25 practice question 10 of 15
GlobalTech Corporation uses Oracle Integration Cloud (OIC) to synchronize data between their CRM and ERP systems. They currently have a scheduled…
Full set: 99 questionsWhen converting a scheduled integration to an app-driven integration in Oracle Integration Cloud, any existing scheduled parameters are deleted, not automatically converted. The developer is responsible for manually re-implementing the logic to handle incoming data from the new REST trigger's request payload or parameters, effectively replacing the functionality of the old scheduled parameters. The conversion wizard does not provide an automatic mechanism for this transition.
A. You must choose an existing REST adapter trigger connection resource. This is a valid requirement. The conversion wizard prompts the user to select a pre-configured REST connection that will act as the new trigger.
B. You cannot convert a scheduled integration to a REST adapter-triggered integration with multiple verbs. This is a valid limitation. The conversion process only supports creating a REST trigger with a single HTTP verb and resource URI.
D. You cannot convert a scheduled integration with assignments that have the fault data type. This is a valid, documented limitation. The conversion wizard cannot process scheduled integrations that contain an assign action using a fault data type.
1. Oracle Cloud Infrastructure Documentation
Using Integrations in Oracle Integration 3
"Convert a Scheduled Orchestration to an App Driven Orchestration": This official guide explicitly lists the limitations of the conversion process.
Regarding option C: "Any existing scheduled parameters are deleted. You must manually add them back as part of the request or response payload configuration of the REST Adapter Endpoint Configuration Wizard." This directly refutes the claim of automatic conversion.
Regarding option A: The documented steps show that in the "Configure Endpoint" section
the user must "select an existing REST Adapter trigger connection to use."
Regarding options B and D: The "Limitations" subsection clearly states
"You cannot convert a scheduled integration to a REST Adapter-triggered integration with multiple verbs" and "You cannot convert a scheduled integration with assignments that have the fault data type."
Keep practicing
Take the free 1Z0-1042-25 practice test
Ten exam-style questions with answers and explanations, plus the exam facts and study guides.
More questions
Other 1Z0-1042-25 practice questions
- Question 1Oracle Integration (OIC) is available in two editions, Standard and Enterprise. Which two…
- Question 2You are creating integrations in Oracle Integration Cloud (OIC) using B2B trading partner…
- Question 3Which statement is valid regarding connection resources in Oracle Integration Cloud (OIC)?
- Question 4Which type of certificate requires the uploading of a keystore (.jks) file in Oracle Inte…
- Question 5You are configuring an Oracle ERP Cloud adapter connection invoke action within an Oracle…
- Question 6Which statement about Oracle Integration Cloud (OIC) is NOT valid?
