1Z0-1133-26 practice question 8 of 10

Which of the following actions is required when setting up drill-through to a relational database as a source system?

Full set: 395 questions
Answer options
A: Setting up manual data validation
B: Configuring the database connection string Correct answer
C: Automating the creation of financial reports
D: Scheduling the drill-through job
Correct Answer:
B. Configuring the database connection string
Explanation

When establishing drill-through connectivity from Oracle Cloud EPM Data Integration to a relational database source, establishing connectivity parameters is mandatory. Configuring the database connection string (including JDBC URL, driver details, username, and password) enables the Data Integration engine or EPM Integration Agent to authenticate, connect, and execute SQL queries directly against the relational database tables or views. Without a properly configured connection string, the system cannot establish communication with the target external database or retrieve the required drill-through query results.

Why Incorrect

A. Manual data validation is an operational control step, not a technical setup requirement for database drill-through.
C. Financial report automation relates to reporting execution, independent of database drill-through setup.
D. Drill-through is an interactive, on-demand query triggered by users, not a scheduled batch job.

References

1. Oracle Enterprise Performance Management Cloud Documentation, "Administering Data Integration for Oracle Enterprise Performance Management Cloud," Section: Configuring Database Connections for Drill-Through.

2. Oracle Cloud EPM Integration Agent Guide, "Configuring Relational Database Connections and Drill-Through SQL Queries."

Scroll to Top