1Z0-902 practice question 15 of 15

You are providing oversight for the delivery of a new Exadata Database Machine. 1. Stabilize the Exadata Rack. 2. Unpack Oracle Exadata Rack. 3. Review the safety guidelines. 4. Let the Exadata acclimatize for 24 hours. 5. Power on Exadata PDU A. 6. Place Exadata in its allocated space. 7. Power on Exadata PDU B. What is the correct order of these steps?

Full set: 85 questions
Answer options
A: 4,3,2,6,1,7,5
B: 3,2,6,4,1,7,5 Correct answer
C: 2,3,4,6,1,7,5
D: 3,2,6,1,4,7,5
E: 2,6,1,4,3,7,5
Correct Answer:
B. 3,2,6,4,1,7,5
Explanation

The correct sequence for Exadata Database Machine delivery follows Oracle's official installation procedures: First, review safety guidelines (3) before any physical handling. Then unpack the rack (2) and place it in its allocated space (6). After positioning, allow 24-hour acclimatization (4) for temperature and humidity adjustment to prevent condensation. Next, stabilize the rack (1) to prevent movement. Finally, power on PDU B (7) followed by PDU A (5), following Oracle's recommended power-up sequence where PDU B typically powers storage and PDU A powers compute nodes.

Why Incorrect

A. 4,3,2,6,1,7,5: Cannot acclimatize before unpacking the equipment.
C. 2,3,4,6,1,7,5: Safety guidelines must be reviewed before unpacking.
D. 3,2,6,1,4,7,5: Stabilizing before acclimatization disrupts the waiting period.
E. 2,6,1,4,3,7,5: Safety guidelines must come first, not after physical work.

References

1. Oracle Exadata Database Machine Owner's Guide, Release 23.1.0, Chapter 2 "Installation", Section 2.3 "Pre-Installation Tasks", pages 2-4 to 2-7

2. Oracle Exadata Database Machine Safety and Compliance Guide, Release 23.1.0, Section 1.2 "Installation Safety", page 1-3

3. Oracle Exadata Database Machine Installation Guide, Release 23.1.0, Section 3.2 "Unpacking and Positioning", pages 3-2 to 3-5

Scroll to Top