A00-260 practice question 1 of 15
Which statement regarding scheduling SAS Data Integration Studio jobs is true?
Full set: 70 questionsThe standard process for scheduling a SAS Data Integration Studio job is a two-step procedure involving two different applications. First, the developer must use the "Deploy for Scheduling" wizard within SAS Data Integration Studio. This action compiles the job into executable SAS code and places it, along with necessary metadata and scripts, into a designated deployment directory. Only after this deployment is complete can an administrator or user with appropriate permissions go into SAS Management Console and use the Schedule Manager plug-in to create a schedule that executes the deployed job. This sequence is fundamental to the SAS scheduling framework.
A. This statement reverses the correct workflow. Deployment is performed from SAS Data Integration Studio; scheduling is performed in SAS Management Console.
B. A dependency generator is not a prerequisite for scheduling on Platform Process Manager. The core requirement is the deployed SAS code generated by SAS Data Integration Studio.
C. While this statement is technically true (multiple jobs can be deployed to the same parent directory, each in its own subdirectory), option D describes the mandatory, sequential process for scheduling, which is a more fundamental and accurate answer regarding the overall procedure.
1. SAS® 9.4 Data Integration Studio 4.9: User's Guide, Chapter 18, "Deploying Jobs for Scheduling," Section: "Overview of Deploying Jobs for Scheduling." The documentation states, "You can deploy SAS Data Integration Studio jobs for scheduling in a SAS scheduling environment... After you have deployed a job, you can use the Schedule Manager plug-in in SAS Management Console to schedule it." This explicitly confirms the sequence described in answer D.
2. SAS® 9.4 Intelligence Platform: System Administration Guide, Fourth Edition, Chapter 29, "Scheduling Jobs with the Schedule Manager Plug-In," Section: "Schedule a New Job Flow." This chapter details the steps for creating a schedule in SAS Management Console. The process begins with the assumption that a job has already been deployed, as the user must select a "Deployed Job" as the object to schedule. This reinforces that deployment from the source application (like DI Studio) must precede scheduling in SAS Management Console.
Keep practicing
Take the free A00-260 practice test
Ten exam-style questions with answers and explanations, plus the exam facts and study guides.
More questions
Other A00-260 practice questions
- Question 3Assume that you have completed the Register Tables wizard in SAS Data Integration Studio.…
- Question 4Assume that SAS Data Integration Studio Table Loader is being used in a job. The load sty…
- Question 5When using the SCD Type 2 load method in SAS Data Integration Studio, which columns can b…
- Question 6The ability to deploy a SAS Data Integration Studio job as a Web service or a SAS Stored …
- Question 7Which statement correctly defines a System DSN?
- Question 8Which action is required for enabling performance statistics on the executing SAS Workspa…
