[Installation Procedures] The mock-up for vibration cast installations demonstrates the adequacy of the: (This may have more than one correct answer; please select all that apply.)
Full set: 85 questionsDomain Inspection
The purpose of a mock-up for vibration cast installations, as defined by API 936, is to qualify the installation procedure. This test specifically demonstrates that the proposed equipment (e.g., mixers, vibrators), the method of attaching the vibrators to the forms, and the overall vibration technique (e.g., frequency, duration, pattern) are adequate to achieve a properly consolidated refractory lining. This qualification ensures the chosen procedure can produce a dense, void-free lining consistent with the material manufacturer's requirements and project specifications before full-scale installation begins.
A. craftsman's ability to construct the forms. This is incorrect because the mock-up primarily qualifies the vibration procedure, not the individual craftsman's skill in formwork, which is covered under general applicator qualification.
1. American Petroleum Institute (API). (2014). API Standard 936: Refractory Installation Quality Control—Inspection and Testing Monolithic Refractory Linings and Materials (4th ed.).
Section 6.3.3.1: This section explicitly states
"A mock-up shall be installed to demonstrate the adequacy of the equipment
means of vibrator attachment
and vibration method." This directly supports options B
C
and D as the correct answers.
Section 6.2: This section
"Applicator/Installer Qualification
" covers the qualification of the individual craftsman's skills
which is a separate requirement from the procedure qualification mock-up discussed in Section 6.3. This supports why option A is incorrect.
Keep practicing
Take the free API-936 practice test
Ten exam-style questions with answers and explanations, plus the exam facts and study guides.
More questions
Other API-936 practice questions
- Question 2[Installation Procedures] A pigment shall be used in the curing compound in order to:
- Question 3[Material Requirements] Which of the following is false per the requirements of API Stand…
- Question 4[Documentation and Records] Who is responsible for ensuring that the material and applica…
- Question 6[Material Requirements] The physical attributes testing of manufactured bricks during pre…
- Question 7[Responsibilities and Qualifications] The installation contractor is required to secure a…
- Question 9[Material Requirements] What temperature is required to form a permanent bond in phosphat…