CBPA practice question 20 of 25
[Process Design] What are the best options for testing new processes at the end of a process design activity?
Full set: 124 questionsABPMP CBOK v3.0 (Ch. 6, §6.6 “Validate the New Process Design”) states that, once a design is completed, the two primary validation techniques are (1) role-playing/structured walk-throughs and (2) computer-based simulation, because together they reveal hand-off issues, timing, queuing and bottlenecks under multiple workload scenarios. These methods allow defects to be discovered before costly piloting or deployment. Therefore, the combination of role-playing and simulation listed in option D best reflects ABPMP-recommended practice for testing a newly-designed process.
A. Lacks simulation, a core ABPMP-recommended validation technique; “direct observation” is impossible for an un-implemented design.
B. “Practice” is undefined; ABPMP lists pilots or prototypes, not “practice,” so the option is imprecise.
C. Relies only on role-playing, omitting simulation, so cannot expose timing/volume-related defects.
1. ABPMP International. Guide to the Business Process Management Common Body of Knowledge (BPM CBOK), Version 3.0, 2019: Chapter 6, §6.6 “Validate the New Process Design”, pp. 193-195.
2. Recker, J. (2016). Business Process Management. Springer. DOI:10.1007/978-3-319-42901-9; see Ch. 7, pp. 143-145 on simulation and role-play for process validation.
3. Van der Aalst, W. (2014). Business Process Simulation Revisited. Enterprise Information Systems 8(2): 287-313. DOI:10.1080/17517575.2012.671700 – highlights simulation’s role in detecting bottlenecks.
Keep practicing
Take the free CBPA practice test
Ten exam-style questions with answers and explanations, plus the exam facts and study guides.
More questions
Other CBPA practice questions
- Question 1[Process Transformation] Change management in Business Process Management (BPM) applies to
- Question 2[Process Governance] Who should participate in a BPM Center of Excellence?
- Question 3[Business Process Management (BPM)] Which is NOT a basic principle of Business Process Ma…
- Question 4[Process Organization] The business process owner is responsible for
- Question 5[Process Transformation] What should NOT be the focus of change initiatives?
- Question 6[Process Performance Management] Which are proven approaches to measure process performan…