CCOA practice question 23 of 25

Which of the following has been established when a business continuity manager explains that a critical system can be unavailable up to 4 hours before operation is significantly impaired?

Full set: 139 questions
Answer options
A: Maximum tolerable downtime (MID)
B: Service level agreement (SLA)
C: Recovery point objective (RPO)
D: Recovery time objective (RTO) Correct answer
Correct Answer:
D. Recovery time objective (RTO)
Explanation

The Recovery Time Objective (RTO) is the target time within which a business process must be restored after a disaster or disruption to avoid unacceptable consequences. The statement that a system can be unavailable for up to 4 hours before significant impairment directly defines this target recovery window. RTO is a key metric in business continuity planning (BCP) and disaster recovery (DR) that dictates the required speed of recovery efforts.

Why Incorrect

A. Maximum Tolerable Downtime (MTD) is the absolute longest time a system can be down before causing irreparable business harm, which is a limit, not a target.
B. A Service Level Agreement (SLA) is a contractual commitment between a service provider and a client, not an internal business continuity metric.
C. Recovery Point Objective (RPO) defines the maximum acceptable amount of data loss measured in time, not the duration of a system outage.

References

1. National Institute of Standards and Technology (NIST). (2010). Special Publication 800-34 Rev. 1, Contingency Planning Guide for Federal Information Systems. Appendix B: Glossary, Page B-5. "Recovery Time Objective (RTO): The maximum amount of time that a system or process can be down before the organization is significantly impacted."

2. ISACA. (2019). CRISC Review Manual, 6th Edition. Chapter 2: IT Risk Assessment. The manual discusses RTO as the determination of the acceptable downtime for a system or application.