Measuring "Business Values" begins first with .
Full set: 40 questionsMeasuring business value for any major IT initiative, such as a data center project, begins with understanding the financial framework. The budget is a primary business constraint that defines the scope of the investment and sets the financial baseline against which value, such as Return on Investment (ROI) and Total Cost of Ownership (TCO), will be measured. All subsequent technical decisions regarding infrastructure, topology, and network are made to maximize business objectives within the financial limits established by the budget. Therefore, the budget is the foundational element for evaluating business value.
A. Physical Infrastructure: This is a technical outcome determined by business requirements and financial constraints, not the starting point for value measurement.
B. Topology: This is a specific design decision made to meet availability and performance goals within the established budget.
C. Network: The network is a component of the overall infrastructure, and its design is constrained by the project's budget and business needs.
1. Uptime Institute. (2021). Tier Standard: Topology. In the Tier Certification Process overview, the initial step is the development of the "Owner's Project Requirements (OPR)," which fundamentally includes the business case, operational requirements, and the capital budget for the project. This establishes the budget as a prerequisite to design.
2. Barroso, L. A., Hölzle, U., & Ranganathan, P. (2018). The Datacenter as a Computer: An Introduction to the Design of Warehouse-Scale Machines (3rd ed.). Morgan & Claypool. In Chapter 1, "Introduction," the authors emphasize that cost is a primary design constraint, stating, "The main design goal for a WSC is to deliver good performance for a given cost... Cost, in particular, is a primary constraint..." (p. 4).
3. Geng, H. (Ed.). (2014). Data Center Handbook. Wiley. Chapter 2, "Data Center Needs Assessment," Section 2.2, "Business Needs," details that the process starts with a business needs analysis where financial feasibility and budget are critical inputs before any technical design commences.
Keep practicing
Take the free CDCP-001 practice test
Ten exam-style questions with answers and explanations, plus the exam facts and study guides.
More questions
Other CDCP-001 practice questions
- Question 1Which source is used in fiber cable to transmit data?
- Question 2Which Class of Fire involves combustible metals or combustible metal alloys such as magne…
- Question 3Which Class of Fires involves energized electrical equipment?
- Question 4True or False: The time taken to diagnose the problem can be considered as Mean Time to R…
- Question 5Which type of Humidifier rapidly vibrates waster to create a fog or mist?
- Question 6Which one of the following is used in Measuring Business Value?