CIMAPRO19-P03-1 practice question 12 of 35

An electricity company owns and operates a nuclear power station located ten miles from a large city. A recent and very extensive engineering examination of the power station concludes with the estimate that the probability of a major nuclear disaster within the next 20 years is 0.2%. Which of the following best explains the relevance of quantifying the risk in that way?

Full set: 275 questions
Answer options
A: There is no acceptable level of risk for a major nuclear accident and so the probability has little information value in itself. Correct answer
B: The probability is so low as to be ignored.
C: The directors will be able to argue that they were not negligent in the event of a major disaster within the 20 year period.
D: The calculation of a precise probability demonstrates that the engineers who conducted the inspection are experts in their field.
Correct Answer:
A. There is no acceptable level of risk for a major nuclear accident and so the probability has little information value in itself.
Explanation

The risk described is a low-probability, high-impact event with catastrophic potential. For such risks, particularly those involving public safety like a nuclear disaster, the societal and regulatory risk appetite is effectively zero. The quantification to 0.2% is a necessary technical step for internal management, engineering controls, and mitigation planning. However, its primary relevance in a strategic and public context is to confirm the existence of a risk whose consequences are so severe that any non-zero probability is considered unacceptable. The focus is on the magnitude of the potential harm, not the low likelihood of its occurrence.

Why Incorrect

B. Low-probability, high-impact risks (catastrophic risks) must be actively managed, not ignored, as their expected negative value can be enormous.
C. Knowledge of a specific risk probability, far from absolving directors of negligence, establishes their awareness and could increase their liability if they fail to act appropriately.
D. The purpose of risk assessment is to inform decision-making and risk mitigation, not to validate the credentials of the assessors.

References

1. COSO Framework (Official Vendor Documentation): The Committee of Sponsoring Organizations of the Treadway Commission (COSO) framework, a core part of the CIMA syllabus, emphasizes the importance of defining risk appetite. For a catastrophic risk like a nuclear disaster, the risk appetite would be set at or near zero due to the extreme negative consequences. The quantification highlights a risk that falls outside any acceptable tolerance level.

Source: COSO. (2017). Enterprise Risk Management — Integrating with Strategy and Performance. Page 51, Principle 8: "Defines Risk Appetite."

2. Academic Publication: Research on risk perception demonstrates that for certain types of hazards, termed "dread risks" (characterized by a perceived lack of control, catastrophic potential, and fatal consequences), public concern is high and not closely related to statistical probabilities. Nuclear power is a classic example of a dread risk.

Source: Slovic, P. (1987). Perception of risk. Science, 236(4799), 280-285. (Specifically, the discussion on the 'dread' factor in the psychometric paradigm of risk, p. 282). DOI: https://doi.org/10.1126/science.3563507

3. CIMA P3 Syllabus Core Concepts: The CIMA P3 syllabus requires candidates to understand that risk management is not just about quantification but also about the nature of the risk and stakeholder attitudes. For high-impact events, qualitative factors and the concept of risk appetite often override purely quantitative assessments. The ALARP (As Low As Reasonably Practicable) principle is relevant, where for risks with massive consequences, the effort to reduce them must be exhaustive.

Source: CIMA. (2019). P3 Risk Management Syllabus. Section B: Enterprise Risk Management, 2(c) "Evaluate the concepts of risk appetite, risk tolerance and risk capacity."