CLT practice question 13 of 25
Which of the following are characteristics of the Just-In-Time (JIT) Principle?
Full set: 115 questionsThe Just-In-Time (JIT) principle is a cornerstone of lean logistics and manufacturing, designed to minimize inventory and eliminate waste. Its primary goal is to have materials arrive at the production facility at the precise moment they are required for manufacturing. This is achieved by ordering goods in smaller lot sizes but with a greater frequency of orders and deliveries. This approach reduces inventory holding costs, minimizes the risk of obsolescence, and decreases the need for warehouse space, thereby increasing overall efficiency.
A. larger lot sizes and decreased frequency of orders: This describes a traditional bulk-purchasing strategy, which is the antithesis of JIT as it maximizes on-hand inventory.
B. larger lot sizes and greater frequency of orders: This combination is impractical and would lead to a rapid and massive accumulation of inventory, directly contradicting JIT's core goal of waste reduction.
D. smaller lot sizes and decreased frequency of orders: This strategy would consistently fail to meet production demand, leading to frequent stockouts and costly interruptions in the production line.
1. Jacobs, F. R., & Chase, R. B. (2018). Operations and Supply Chain Management (15th ed.). McGraw-Hill Education. In Chapter 12, "Lean Supply Chains," the section on JIT Production details that lean systems require "producing only what is needed, when it is needed... This means small lot sizes and frequent deliveries from suppliers." (pp. 410-412).
2. Womack, J. P., Jones, D. T., & Roos, D. (2007). The Machine That Changed the World. Free Press. Chapter 3, "The Elements of the System," explains that a key element of the Toyota Production System (the origin of JIT) is the ability to produce in small lots, which necessitates frequent changeovers and deliveries to maintain a continuous flow.
3. Stevenson, W. J. (2021). Operations Management (14th ed.). McGraw-Hill Education. In Chapter 14, "JIT and Lean Operations," the text states, "A key to JIT is the ability to produce in small lot sizes... This requires frequent, small deliveries." (p. 639).
4. MIT OpenCourseWare. (2006). 15.762J Supply Chain Planning, Lecture 10: The Bullwhip Effect and Collaboration. Massachusetts Institute of Technology. The lecture notes explain that JIT systems mitigate the bullwhip effect by using frequent, small orders to better match supply with real-time demand, thus avoiding large, infrequent orders that create excess inventory.
Keep practicing
Take the free CLT practice test
Ten exam-style questions with answers and explanations, plus the exam facts and study guides.
More questions
Other CLT practice questions
- Question 1Which additional documents are required when shipping or receiving international material…
- Question 2Which of the following is a type of Bill of Lading document?
- Question 3Which of the following forms contains the address of the shipper, the address of the cons…
- Question 4If a delivery arrives unscheduled, the vehicle will be
- Question 5Before unloading, it is essential to ensure that the vehicle is safely secured. Which of …
- Question 6Which of the following is NOT a purpose of the Bill of Lading?