CSQA practice question 29 of 35
Which of the following are considered distinguishing characteristics of Risk?
Full set: 471 questionsRisk is a multifaceted concept defined by several interdependent characteristics. It is situational, as its relevance and severity depend entirely on the project's specific context. It is time-based, meaning the probability and impact of a risk can change throughout the project lifecycle. Risk is also magnitude-dependent, as it is quantified by its potential impact or the severity of the loss. Finally, risk is inherently value-based; an event is only a risk if it threatens an asset, objective, or outcome that stakeholders value. Because all these attributes are essential for a complete definition, they are all considered distinguishing characteristics of risk.
Options A, B, C, and D are not incorrect; they are simply incomplete. Each describes a valid characteristic of risk, but the most comprehensive answer is the one that includes all of them.
1. Boehm, B. W. (1991). Software Risk Management: Principles and Practices. IEEE Software, 8(1), 32-41. In Section "The Six Basic Steps in Software Risk Management" (p. 34), the principles discussed implicitly cover these characteristics. Risk identification is situational, risk control is time-based, and risk analysis (estimating probability and loss) is both magnitude and value-based. (DOI: https://doi.org/10.1109/52.62940)
2. University of Toronto, Department of Computer Science. (2011). CSC444F/2108F Software Engineering: Lecture 5 - Risk Management. In slides 10-14, risk is defined by its components: probability and consequence (magnitude-dependent), which are assessed within a specific project context (situational) and must be tracked over time (time-based). The entire process is predicated on protecting project objectives (value-based).
3. ISO 31000:2018, Risk management — Guidelines. Clause 3.1 defines risk as the "effect of uncertainty on objectives." This definition encompasses the characteristics: "effect" relates to magnitude, "uncertainty" relates to the situational and time-based nature, and "objectives" relates to what is valued.
Keep practicing
Take the free CSQA practice test
Ten exam-style questions with answers and explanations, plus the exam facts and study guides.
More questions
Other CSQA practice questions
- Question 1Within an ISO process assessment, a capability level is said to be established 'only' and…
- Question 2As the maturity level increases, the cost per unit of work increases.
- Question 3QFD can be used to provide forward and backward traceability of value in the software dev…
- Question 4If common causes of variation result in a process operating outside the customer's specif…
- Question 5Good ideas are of little value unless they are accepted and implemented.
- Question 6Cooperation is required to improve quality and to implement quality management.