CSSGB practice question 25 of 30
Training cost $6,500 and a project required an initial investment of $47,500. If the project yields monthly savings of $3,500 beginning after 4 months, what is the payback period in months, before money costs and taxes?
Full set: 148 questionsDomain Control Phase
The payback period is the time required for the cumulative savings from a project to equal the total initial investment. First, calculate the total initial investment by summing the project investment and training costs: $47,500 + $6,500 = $54,000. Next, determine the time required to recover this investment once savings begin: $54,000 / $3,500 per month ≈ 15.4 months. The problem states that savings begin after 4 months. This initial delay must be added to the recovery time. Therefore, the total payback period is the sum of the delay and the recovery period: 4 months + 15.4 months = 19.4 months.
A. 9.7: This figure does not correspond to a correct calculation of the payback period using the provided data.
B. 15.4: This represents only the time to recover the investment after savings have started, but it incorrectly omits the initial 4-month delay period.
D. 23.7: This figure is not derivable from a standard payback period calculation and likely results from a miscalculation or misinterpretation of the inputs.
1. ASQ Certified Six Sigma Green Belt Body of Knowledge (BoK): The BoK, under Section I.F.3 (Business case and project charter), requires understanding financial measures to justify projects. The payback period is a fundamental metric for this purpose, evaluating the time to recoup the initial investment. The calculation method used is standard financial practice for this metric.
2. Park, C. S. (2019). Contemporary Engineering Economics (7th ed.). Pearson. In Chapter 7, "Payback Period Analysis," the payback period is defined as the time required for the cumulative net cash flow to equal the initial investment (p. 298). The calculation involves dividing the initial cost by the periodic savings, and any initial period with no cash flow is added to this time.
3. Thuesen, G. J., & Fabrycky, W. J. (2001). Engineering Economy (9th ed.). Prentice Hall. Chapter 5, Section 5.3, "The Payback Period," describes the method as calculating the period of time required for the profit or savings of an investment to equal its cost. The formula is given as Payback Period = Initial Cost / Uniform Annual Benefit (p. 178). The example demonstrates that the clock starts at time zero, including any non-productive periods.
Keep practicing
Take the free CSSGB practice test
Ten exam-style questions with answers and explanations, plus the exam facts and study guides.
More questions
Other CSSGB practice questions
- Question 1Measurement error is defined as the effect of all sources of measurement variability that…
- Question 2Cost of Poor Quality (COPQ) can be classified as Tangible (Visible) Costs and Hidden Cost…
- Question 3The higher the sigma level of a process the better the performance.
- Question 4What is the Cycle Time, in minutes, for a process having a Throughput of 360 units per ho…
- Question 5Hypothesis Tests determine the probabilities of differences between observed data and the…
- Question 6According to the definition of Rolled Throughput Yield which of these items best describe…