A deployment engineer is installing a PowerEdge XE8640 server. The server is on a lift, and they have aligned the server inner rails with the rail…

Choose your answer, then check it against the explanation.

A deployment engineer is installing a PowerEdge XE8640 server. The server is on a lift, and they have aligned the server inner rails with the rail assemble that are secured in the rack. The engineer can only push the server into the rack a short distance before it stops. Pushing forcefully causes the rack to slide back. What action should the deployment engineer take?