D-PST-MN-A-01 practice question 3 of 15
What ensures the correct replacement of a PSU in PowerStore?
Full set: 185 questionsDomain PowerStore Concepts and Features
Verifying the Light Emitting Diode (LED) status is a critical step in the PowerStore Power Supply Unit (PSU) replacement procedure. Before removal, the amber fault LED identifies the specific PSU that has failed. After installing the new PSU, observing the status LEDs—typically a solid green light for both AC and DC power—confirms that the new unit is properly seated, receiving power, and functioning correctly. This visual verification ensures the replacement was successful without interrupting system operations, as PSUs are designed to be hot-swappable.
A. Replace both PSUs at the same time: This is incorrect. PowerStore appliances use redundant PSUs for high availability; replacing both simultaneously would cause a complete power loss and a system outage.
C. Place node in maintenance mode: This is not required. PSUs are enclosure-level Field Replaceable Units (FRUs) and are hot-swappable. Node maintenance mode is for servicing node-specific components.
D. Power off both controllers: This is incorrect. Powering off the controllers (nodes) would cause a full system shutdown. PSU replacement is a non-disruptive online procedure. ---
1. Dell PowerStore: Service and Replacement Procedures Guide (for PowerStore T and X Models)
Reference: In the section "Replacing a power supply in a base enclosure
" Step 6 explicitly states: "Verify that the power supply AC and DC power status LEDs are green." This confirms that checking the LEDs is a mandatory verification step in the official procedure.
2. Dell PowerStore: Hardware Information Guide
Reference: In the chapter "Base Enclosure
" the section "Power supply LEDs" details the meaning of each LED state (AC Power
DC Power
Fault). For example
a lit amber Fault LED indicates a "power supply fault." This documentation establishes the LEDs as the primary physical indicators for PSU status
essential for both fault identification and replacement verification.
Keep practicing
Take the free D-PST-MN-A-01 practice test
Ten exam-style questions with answers and explanations, plus the exam facts and study guides.
More questions
Other D-PST-MN-A-01 practice questions
- Question 1What is the correct practice when connecting PowerStore to front-end switches?
- Question 2After replacing a drive, how is the rebuild process initiated in PowerStore?
- Question 4After a successful PowerStore OE upgrade, which two actions are required?
- Question 5Which step must be performed before powering off a PowerStore appliance for maintenance?
- Question 6What is the correct rollback action if a PowerStore OE upgrade introduces instability?
- Question 8Which step ensures minimum risk when performing hardware upgrades in PowerStore?