D-PST-MN-A-24 practice question 8 of 15
When a Dell EMC PowerStore node powers up in service mode, what are the commands and sequence used from the appliance SSH client to restore the node back to normal?
Full set: 61 questionsTo return a Dell EMC PowerStore node from service mode to its normal operational state, a two-step process is required. First, the service mode flag, also known as the rescue state, must be cleared. This is accomplished with the svcrescuestate clear command, which instructs the node not to enter service mode on its next boot. Second, the node must be rebooted for the change to take effect. The svcnode reboot command performs this restart, allowing the node to boot into normal mode. This specific sequence is the correct and required procedure.
A: svcrescuestate start is the command used to enter service mode, which is the opposite of the desired outcome. B: The command sequence is incorrect. The rescue state must be cleared before the node is restarted; shutting it down first is improper procedure. D: svcrescuestate normal is not a valid command. The correct argument to exit service mode is clear.
1. Dell PowerStore Service Scripts Reference Guide (Version 3.0)
Page 121
Section: svcrescuestate: This section details the svcrescuestate command. It explicitly states that the clear argument "Clears the rescue reason
so that the node boots into normal mode on the next reboot."
Page 118
Section: svcnode: This section describes the svcnode command
which includes the reboot subcommand used to restart the node.
2. Dell PowerStore Command Line Interface Reference Guide (Version 3.0)
Page 161
Section: svcrescuestate: Confirms that svcrescuestate clear is the command to clear the service mode state
enabling a normal boot.
3. Dell Technologies Knowledge Base Article 000131187
"PowerStore: How to place a node into Service Mode"
Section: "How to take a node out of Service Mode": This official procedure document explicitly lists the required steps in the correct order: 1. Run svcrescuestate clear. 2. Run svcnode reboot.
Keep practicing
Take the free D-PST-MN-A-24 practice test
Ten exam-style questions with answers and explanations, plus the exam facts and study guides.
More questions
Other D-PST-MN-A-24 practice questions
- Question 2What is the alert severity if the license expiration date is within a week?
- Question 3Which component is an FRU?
- Question 4How is a defective embedded module displayed in Dell EMC PowerStore Manager?
- Question 5While on-site troubleshooting a Dell EMC PowerStore system, the node B embedded module fa…
- Question 6Which network traffic is encrypted using IPsec?
- Question 7Which reference source provides service information and FRU procedures for Dell EMC Power…
