H12-831_V1-0 practice question 15 of 35
After the cutover acceptance is completeD. what work still needs to be performed in the closing stage?
Full set: 265 questionsDomain Network Features
The project closing stage, which follows the technical cutover and its acceptance, involves all activities required to formally conclude the project and transition the solution to the operations team. This includes: Transfer training (A): Providing the customer's operations and maintenance (O&M) team with the necessary skills to manage the new system. Data transfer (B): Handing over final project data, which includes as-built documentation, configuration files, logs, and performance reports. Acceptance summary (C): Creating a final report that summarizes the project's deliverables against the acceptance criteria, documenting the formal sign-off. Field defense (D): A final review meeting with stakeholders to present and defend the project results, ensuring all objectives were met and facilitating the final handover.
All the provided options are correct and represent integral activities of the project closing stage in a structured project management framework.
1. Huawei HCIP-Datacom-Core Technology V1.0 Training Material. Chapter: Network Implementation and Project Management. Section: Project Closing Phase. This section details the necessary steps to finalize a network implementation project after technical acceptance, listing activities such as knowledge transfer (training), final documentation handover (acceptance summary, data transfer), and final stakeholder reviews (field defense) as critical components of the closing process.
2. Project Management Institute (PMI). A Guide to the Project Management Body of Knowledge (PMBOK® Guide). Section: Project Closing Process Group. The standard industry framework describes the closing phase as including the finalization of all activities, formal sign-off, handover of the final product to others (e.g., operations), and the archiving of project information. This aligns with all the activities listed in the options. Huawei's project delivery methodology is based on these industry-standard principles.
Keep practicing
Take the free H12-831_V1-0 practice test
Ten exam-style questions with answers and explanations, plus the exam facts and study guides.
More questions
Other H12-831_V1-0 practice questions
- Question 10About the site in the BGPIMPLS IP VPN network architecture. Which of the following descri…
- Question 13In the MPLS network, there are different operation types for labels, among which the mean…
- Question 17MPLS is called Multi-Protocol Label Switching. Regarding the label description in MPLS, t…
- Question 18A router's Network LSA is shown in the figure. Which of the following statements is corre…
- Question 19What is the meaning of display current-configuration I include vlan command?
- Question 21Which of the following sequences can be matched by the regular expression 100.S