H35-660_V2-0 practice question 4 of 35

The same network slicing scheme is used for the low-voltage power consumption information collection slice and the precise load control slice. (True or False, 2 points)

Full set: 344 questions
Answer options
A: True
B: False Correct answer
Correct Answer:
B. False
Explanation

Question analysis: The collection of low-voltage power consumption information belongs to the mMTC scenario, and the precise load control is the uRLLC scenario, and the same slice scenario cannot be used.