HPE7-A03 practice question 6 of 15
You are responding to the customer's RFP and are at the point of documenting design decisions that were not specified in the RFP or the RFP questions. What are valid examples of assumptions made that should be presented to the customer during the response? (Select three >
Full set: 73 questionsWhen responding to a Request for Proposal (RFP), it is critical to document any assumptions made about the customer's environment, especially for factors not specified in the RFP. These assumptions define the prerequisites and boundaries for the proposed solution's success. Key assumptions include:
1. Operational Readiness (A): The proposal assumes the customer possesses the necessary technical expertise for implementation and management unless professional services are explicitly included.
2. Physical Site Readiness (D): The solution's hardware requires adequate data center space, rack units, power, and cooling.
3. Virtual Infrastructure Readiness (E): Modern solutions often rely on management software deployed as virtual machines, assuming the customer has a virtual environment with sufficient resources.
B. The existence of optional monitoring systems is a valid but secondary assumption, often related to integration rather than the core deployment prerequisites covered by A, D, and E.
C. Equipment availability is a vendor commitment and a factor of their supply chain; it is not an assumption made about the customer's environment or capabilities.
F. The customer's budget is a commercial constraint that the vendor's proposal aims to meet. The vendor provides a price for evaluation, not assume budgetary sufficiency.
1. HPE Education Services. (2021). Aruba Design and Deploy Mobility Solutions, Rev. 21.21. Courseware Student Guide. In modules covering the "Plan and Design" phases, the methodology emphasizes identifying and documenting customer requirements, constraints, and assumptions. Assumptions are defined as factors believed to be true in the absence of explicit information, with site readiness (power, space), available VM infrastructure, and customer skill sets being primary examples. (Specific reference: Module 2: Information Gathering and Preparation).
2. HPE. (2022). HPE SimpliVity 2600 Gen10 Deployment Guide. This official vendor documentation outlines explicit prerequisites for deployment. Section "Site planning," specifies requirements for "Space and airflow," "Power," and "Environmental" conditions, directly supporting the assumption in option D. The guide also details hypervisor and vCenter requirements, supporting the assumption of adequate virtual resources (Option E). (Specific reference: Chapter 2: Site planning).
3. Aruba, a Hewlett Packard Enterprise company. (2023). Aruba ClearPass Policy Manager 6.11.x Deployment Guide. In the "Installation" section, the guide provides detailed specifications for deploying ClearPass as a virtual appliance on VMware ESXi and other hypervisors. It lists minimum CPU, memory, and disk space requirements, which presumes the customer has a virtual environment capable of meeting these needs (Option E). (Specific reference: Chapter 2: Installing ClearPass on a Virtual Appliance).
Keep practicing
Take the free HPE7-A03 practice test
Ten exam-style questions with answers and explanations, plus the exam facts and study guides.
More questions
Other HPE7-A03 practice questions
- Question 7A large multinational financial institution has contracted you to design a new full-stack…
- Question 8The customer recently found out that Aruba OS-CX switches are capable of Application Reco…
- Question 9ACME retail has 38 locations spread out across Ave US states and two provinces in Canad a…
- Question 10A large multinational financial institution has contracted you to design a new full-stack…
- Question 13Which is true when it comes to Aruba Central licensing for gateways? (Select two.)
- Question 14The current IT staff is used to working with legacy Aruba OS-S (ProCurve> equipment. They…