ICGB practice question 21 of 30
A Stable process is a process whose output is consistent over time. A primary tool used to analyze Stability would be a ________________.
Full set: 200 questionsProcess stability refers to the consistency of the process output over time, meaning its variation is predictable and only due to common causes. A Time Series Plot, which graphs data points in chronological order, is the fundamental tool for visualizing and analyzing the behavior of a process over time. Control charts, the primary statistical tool for determining stability, are a specialized form of time series plot that includes statistically derived control limits to differentiate between common and special cause variation.
A. Data Forward Plot - This is not a standard term or tool used in statistical process control for analyzing stability.
B. Bag Plot - This is a bivariate statistical chart, analogous to a box plot, used for 2D data and does not analyze process performance over time.
C. Min/Max Plot - While this can show the range of variation, it is not the primary or most effective tool for assessing process stability over time compared to a control chart or time series plot.
1. NIST/SEMATECH. (n.d.). e-Handbook of Statistical Methods. Section 6.3.1, "Control Charts." The handbook states, "A control chart is a graph used to study how a process changes over time. Data are plotted in time order."
2. MIT OpenCourseWare. (2013). 15.062 Data, Models, and Decisions, Fall 2007. Lecture 20, "Statistical Process Control." The lecture introduces control charts as a primary tool for monitoring a process over time to distinguish between common and special cause variation, establishing stability.
Keep practicing
Take the free ICGB practice test
Ten exam-style questions with answers and explanations, plus the exam facts and study guides.
More questions
Other ICGB practice questions
- Question 1In the late 1980’s William Smith coined the name Six Sigma for a methodology that had its…
- Question 2The Z score is a measure of the distance in Standard Deviations of a sample data point fr…
- Question 3Typically a person who is trained to the skill level of a Black Belt is nearly 80% dedica…
- Question 4Which of these is Discrete data?
- Question 5The X-Y Diagram is a tool used to identify/collate potential X's and assess their relativ…
- Question 6Use of the ________ approach is the most classic arrangement when constructing a Fishbone…