ISTQB-ATTA practice question 15 of 15
Identify the most significant risk introduced by this approach to incident management. 3 credits [K4]
Full set: 65 questionsThe described approach uses disconnected spreadsheets and text files for incident management. The most significant risk of this manual method is data completeness. Incidents may be forgotten, lost, or have crucial details omitted during manual entry. This creates an unreliable and incomplete record of defects, which fundamentally undermines the entire purpose of incident management, including status tracking, root cause analysis, and process improvement. While other issues exist, the risk of having a fundamentally incomplete dataset is the most critical failure point, as decisions would be based on missing or inaccurate information.
A. Lack of synchronization is a valid data integrity risk, but it is a symptom of the broader and more critical risk of overall data incompleteness.
B. Low usability affects efficiency, but it is a secondary concern compared to the primary risk of having an untrustworthy and incomplete data repository.
D. Non-conformance to a standard like IEEE 1044 is a process maturity issue, not the most significant operational risk compared to fundamental data loss. ---
1. ISTQB Advanced Level Test Manager Syllabus 2012. Section 5.3.2, "The Defect Lifecycle and the Defect Management Process." The syllabus emphasizes the need for a defect tracking tool to "make sure that... the information about the defect is complete and correct." This highlights that completeness is a primary goal that a manual file-based system puts at significant risk.
2. ISTQB Advanced Level Test Analyst Syllabus 2019 v1.1. Section 3.2.2, "Incident Report Information." This section details the comprehensive information an incident report should contain. A manual system using spreadsheets and text files is highly susceptible to omitting this information, leading to incomplete records that hinder analysis and resolution.
3. Pressman, R. S., & Maxim, B. R. (2020). Software Engineering: A Practitioner's Approach (9th ed.). McGraw-Hill. In chapters on software quality assurance and project management, the text discusses the necessity of formal, tool-based defect tracking systems to ensure all anomalies are captured, tracked, and managed. It implicitly identifies the risk of ad-hoc methods (like spreadsheets) as the potential for lost or incomplete defect information. (Refer to discussions on configuration management and change control).
Keep practicing
Take the free ISTQB-ATTA practice test
Ten exam-style questions with answers and explanations, plus the exam facts and study guides.
More questions
Other ISTQB-ATTA practice questions
- Question 3Which additional set of test cases is needed to achieve both 100% statement coverage and …
- Question 4How many test cases are needed to test code fragment lines 26 – 32 to achieve 100% condit…
- Question 6It has been suggested to organize a performance test to find out more regarding the third…
- Question 7To address reliability a number of measures will be taken throughout the development and …
- Question 8A developer has spent three days looking at a system that crashes now and then. The probl…
- Question 9Based on the state diagram above, how many test cases are needed to achieve 1-switch cove…
