The amount of landfill-destined waste generated during project construction can be reduced by requiring the general contractor to

Full set: 305 questions
Answer options
A: burn paper and cardboard materials on-site
B: use contractor vehicles to disperse waste materials to multiple disposal sites within the project region
C: follow requirements for using dimensional construction materials, prefabrication or material efficient framing Correct answer
D: take advantage of municipal waste pick-up to reduce the weight of the project's construction material scraps
Correct Answer:
C. follow requirements for using dimensional construction materials, prefabrication or material efficient framing
Explanation

The amount of landfill-destined waste generated during project construction can be reduced by requiring the general contractor to follow requirements for using dimensional construction materials, prefabrication or material efficient framing. These methods reduce the amount of material waste by minimizing cutting, fitting, and trimming on site, and by using standardized or modular components that can be easily reused or recycled. The LEED Green Associate Candidate Handbook states that one of the strategies for achieving materials and resources efficiency is to “reduce construction waste through efficient framing techniques” [1, p. 15]. Reference: LEED Green Associate Candidate Handbook, [Reducing Construction Waste | U.S. Environmental Protection Agency]