LEED-GREEN-ASSOCIATE practice question 7 of 35
The amount of landfill-destined waste generated during project construction can be reduced by requiring the general contractor to
Full set: 305 questionsThe amount of landfill-destined waste generated during project construction can be reduced by requiring the general contractor to follow requirements for using dimensional construction materials, prefabrication or material efficient framing. These methods reduce the amount of material waste by minimizing cutting, fitting, and trimming on site, and by using standardized or modular components that can be easily reused or recycled. The LEED Green Associate Candidate Handbook states that one of the strategies for achieving materials and resources efficiency is to “reduce construction waste through efficient framing techniques” [1, p. 15]. Reference: LEED Green Associate Candidate Handbook, [Reducing Construction Waste | U.S. Environmental Protection Agency]
Keep practicing
Take the free LEED-GREEN-ASSOCIATE practice test
Ten exam-style questions with answers and explanations, plus the exam facts and study guides.
More questions
Other LEED-GREEN-ASSOCIATE practice questions
- Question 1Which of the following facilitates the recharging of aquifers?
- Question 2What standard addresses Indoor Environmental Quality?
- Question 3Which of the following is a strategy that a design team should consider In order to decre…
- Question 4A project has 16 employees working for four hours per day, 20 employees working six hours…
- Question 5In the commercial LEED Rating System, which point range will achieve the Certified level …
- Question 6Which strategy is an example of permanent entryway systems used to reduce dust, dirt and …
