MANUFACTURING-CLOUD-PROFESSIONAL practice question 8 of 25

Universal Containers has implemented Rebate Management and wants to define the Benefit information section of a Rebate Type Benefit. Which Sequence of Minimum and Maximum Range values would be valid?

Full set: 151 questions
Answer options
A: 0 to 100 Correct answer
B: 101 to 200
C: 201 to 300
D: 301 to 400
Correct Answer:
A. 0 to 100
Explanation

When defining benefit tiers for a rebate type, the ranges for each tier must be contiguous and non-overlapping. A range of 0 to 100 is a valid definition for the first tier in a benefit structure. Subsequent tiers would then logically start from the next whole value, such as 101. While all the provided options represent technically valid, non-overlapping ranges that could exist within a sequence, a benefit structure's first tier typically begins at zero to account for all possible values.

Why Incorrect

B. This is a valid range for a tier, but it would not typically be the first in a sequence as it does not start from zero.
C. This is a valid range for a tier, but it would follow other, lower-value tiers and is not the logical starting point of a benefit structure.
D. This is a valid range for a tier, but it would appear later in a sequence after lower-value tiers have already been defined.

References

1. Salesforce Help. (2023). "Create a Rebate Program". Salesforce Manufacturing Cloud Administrator Guide. The documentation illustrates creating benefit tiers with ranges that start from 0, establishing this as a standard practice.

2. Salesforce Help. (2023). "Rebate Management Objects". Manufacturing Cloud Developer Guide. The description of the RebateProgramTier object implies the definition of sequential ranges (MaximumValue, MinimumValue) that constitute a complete, non-overlapping structure.

Scroll to Top