NCP-BC practice question 2 of 25
An organization uses Nutanix Disaster Recovery with automatic virtual network creation in the Nutanix Cloud AZ. After a successful failback operation from the Nutanix Cloud AZ to the on-premises site, what is the expected behavior regarding the dynamically created virtual networks at the recovery site?
Full set: 109 questionsNutanix DRaaS (formerly Xi Leap) is designed for operational efficiency and cost-effectiveness. When a failback operation from the Nutanix Cloud AZ to the on-premises site is completed, the temporary resources created in the cloud for the failover, such as virtual networks, are no longer needed. The service automatically de-provisions and cleans up these resources. This automated cleanup prevents unnecessary resource consumption and associated costs in the cloud environment, ensuring the tenant only pays for what is actively in use.
A. The networks are temporary for failover/testing purposes and are not intended to be converted into permanent production networks.
C. The process is automated to reduce administrative overhead; manual deletion is not the standard behavior for these dynamically created resources.
D. Billing is based on resource consumption; resources are removed when no longer required, not kept active for an entire billing cycle.
1. Nutanix DRaaS Administration Guide, "Failback", Section: "Failback Cleanup". The documentation states that after a successful failback, the Nutanix Cloud Services portal automatically cleans up the VMs and associated network configurations that were provisioned during the failover.
2. Nutanix University, "Nutanix Business Continuity and Disaster Recovery (NCP-BC) 6.5", Module 5: Disaster Recovery with Nutanix Cloud Services, Lesson: Failover and Failback. The course material describes the lifecycle of resources in a DRaaS failover, highlighting the automatic cleanup post-failback.
Keep practicing
Take the free NCP-BC practice test
Ten exam-style questions with answers and explanations, plus the exam facts and study guides.
More questions
Other NCP-BC practice questions
- Question 1When designing a Disaster Recovery strategy to an NC2 cluster using MST, which technical …
- Question 3An administrator configures disaster recovery between an on-premises AZ and a Nutanix Clo…
- Question 4An administrator needs to provide leadership with a report showing the timeframe of each …
- Question 5After a failover and stabilization of workloads at the recovery AZ, an administrator remo…
- Question 6An administrator executes an Unplanned Failover of web server VMs from an on-premises AZ …
- Question 7A Protection Domain exists with a VM, but no new snapshots are being created and replicat…
