After making a configuration change on the NIOS Grid, you are prompted to restart services. What option provides the least service disruption?
Full set: 80 questionsThe "Restart if needed on all members sequentially" option is designed to minimize service disruption in a production environment. When this option is selected, NIOS intelligently identifies only the members whose services are affected by the configuration change and require a restart. It then proceeds to restart the services on these members one by one (sequentially). This ensures that while one member is temporarily unavailable, other members in the Grid (such as an HA pair or geographically redundant servers) remain active to handle DNS and DHCP client requests, thus maintaining overall service availability.
A. Force restart on all members simultaneously: This option is the most disruptive, as it causes a complete, Grid-wide outage of services by taking all members offline at the same time.
C. Force restart on GM only: Restarting only the Grid Master (GM) is insufficient, as it does not apply the configuration changes to the Grid Members that are actively serving DNS/DHCP traffic.
D. Restart if needed on HA members only: This is too specific and potentially incomplete. The configuration change might affect standalone members as well, which would be missed, leading to an inconsistent state.
1. Infoblox NIOS 9.0 Administrator Guide, Page 68, "About Service Restarts":
"When you restart services for a group of members, the Grid Master restarts them one by one. This sequential restarting of services minimizes interruptions in DNS and DHCP services." This statement directly supports the principle that sequential restarts are designed to minimize disruption.
2. Infoblox NIOS 8.5 Administrator Guide, Page 66, "About Service Restarts":
"When you make changes to the Infoblox Grid or to its members, you must restart their services for the changes to take effect... To minimize service interruptions, you can restart services for a group of members. The Grid Master restarts them one by one." This reinforces that sequential restart is the standard procedure for minimizing impact.
3. Infoblox Training Courseware, Infoblox Core DDI Advanced Troubleshooting (CDAT), Module: Grid Operations and Maintenance.
The courseware explains that the standard restart procedure initiated from the Grid Manager toolbar is a sequential process. It contrasts this with a forced, simultaneous restart, highlighting the former as the best practice for maintaining service uptime during configuration updates. The "if needed" logic ensures only impacted members are touched.
Keep practicing
Take the free NIOS-DDI-EXPERT practice test
Ten exam-style questions with answers and explanations, plus the exam facts and study guides.
More questions
Other NIOS-DDI-EXPERT practice questions
- Question 1To revert to an older version of code, the user must be able to upgrade from that older v…
- Question 2When configuring Authentication Policy, an administrator should always choose a group for…
- Question 3A customer reports difficulty joining a standalone High Availability (HA) pair. How shoul…
- Question 4The DHCP server has assigned an address, but the client did not renew before the lease ti…
- Question 5What sends the email messages for Workflow Approval notifications in NIOS?
- Question 7An administrator is copying records between DNS zones. What records can be selected for c…