NS0-516 practice question 15 of 15

A customer needs to add an EF280 with FC into its existing Brocade fabric but the FC ports in the SANtricity System Manager are showing the FC ports as down and the LED on the FC HIC is amber. Which three tasks does the installer need to complete to solve this problem? (Choose three.)

Full set: 64 questions
Answer options
A: Verify that the ports are enabled on the switch Correct answer
B: Verify that the cables are plugged into the switch Correct answer
C: Verify that the server HBA has the boot BIOS enabled
D: Verify that the EF280s management port is up
E: Verify that the switch zone has the WWPNs for the EF280 and Server HBAs Correct answer
Correct Answer:
A. Verify that the ports are enabled on the switch; B. Verify that the cables are plugged into the switch; E. Verify that the switch zone has the WWPNs for the EF280 and Server HBAs
Explanation

The symptoms described—Fibre Channel (FC) ports showing as "down" in SANtricity and an amber HIC LED—indicate a problem at the physical or link layer of the SAN fabric. To resolve this and successfully integrate the EF280 array, the installer must address three key areas:
1. Physical Connectivity: The most fundamental step is to ensure the physical path is complete and correct. This involves verifying that the FC cables are securely plugged into both the EF280 HIC and the Brocade switch ports (B).
2. Link Enablement: Switch ports are often disabled by default for security. The installer must verify the specific ports on the Brocade switch are administratively enabled to allow a link to be established (A).
3. Fabric Access Control: For the server and storage to communicate, the fabric must be configured to permit it. This is achieved through zoning, which requires creating a zone containing the World Wide Port Names (WWPNs) of the EF280 ports and the server's HBA ports (E). These three tasks cover the physical, link, and fabric service layers required for successful integration.

Why Incorrect

C. Verify that the server HBA has the boot BIOS enabled This setting is only for booting an operating system from the SAN and does not affect the physical link status between the storage array and the switch.
D. Verify that the EF280s management port is up The management port is used for out-of-band administration via SANtricity and is on a separate network from the FC data path; its status is irrelevant to FC connectivity.

References

1. NetApp

Inc. (2021). EF280 and EF570 Hardware and Maintenance Guide.

Section: "Controller canister LEDs"

Content: This guide details the meaning of the host port link status LEDs. An amber or off LED indicates a link fault

no SFP

or no connection

which directly supports troubleshooting steps related to physical cabling (B) and the switch port status (A).

2. NetApp

Inc. (2022). E-Series and EF-Series SAN Installation Guide for Fibre Channel Host Bus Adapters.

Section: "Installation and cabling

" "Configuring the switches"

Content: This document outlines the required steps for installing an E-Series array in an FC SAN. It explicitly states the need to physically cable the array to the switches (B) and then configure the fabric

which includes creating zones with the correct WWPNs for the host and storage ports (E).

3. Brocade (a Broadcom company). (2021). Brocade Fabric OS Administration Guide

9.0.x.

Section: "Port Administration

" "Managing Zones"

Content: This official vendor documentation for the switch fabric describes the portEnable command

which is used to bring a port online (A). It also details the entire process of zone administration

which is based on WWPNs to control device-to-device access (E).

Scroll to Top