NS0-520 practice question 11 of 30

You need to migrate boot LUNs from a third-party array onto a Netapp FAS8700. Which three actions are required to complete this task? (choose three)

Full set: 234 questions
Answer options
A: Reboot the third-party SAN to prepare for the LUN Import
B: Verify third-party array support by using the Interoperability Matrix Tool (IMT) Correct answer
C: Convert every FC target port on each controller to an FC initiator port
D: Convert a single FC port on each controller to an FC initiator port Correct answer
E: Create zoning between the third-party array to the FAS8700 Correct answer
Correct Answer:
B. Verify third-party array support by using the Interoperability Matrix Tool (IMT); D. Convert a single FC port on each controller to an FC initiator port; E. Create zoning between the third-party array to the FAS8700
Explanation

We only need to convert one FC to initiator per node, if you need to enable multipath with 2 switches, then you need 2 ports on initiator mode per node https://kxbjsyuhceggsyvxdkof.supabase.co/storage/v1/object/public/file-images/NetApp_NS0-520/page_99_img_1.jpg https://manualzz.com/doc/24230310/san-migration-using-foreign-lun-import (10) (15)(16)

Scroll to Top