A site survey has been conducted for an installation of a switchless HA pair with two NetApp DS224C shelves in the customer's already populated rack. Which of the following two need to be verified to ensure a successful deployment? (Choose two.)
Full set: 65 questionsWhen installing new hardware, such as a NetApp HA pair and two DS224C shelves, into an existing, populated rack, a site survey must confirm fundamental physical requirements. First, it is essential to verify that there are sufficient contiguous Rack units (U) available to physically mount the new controllers and shelves. The DS224C shelf, for example, requires 2U of space. Second, adequate Power connections must be available from the rack's Power Distribution Units (PDUs), and the existing power infrastructure must be able to support the additional load from the new equipment. These two factors, space and power, are critical prerequisites for a successful hardware deployment.
A. Cluster switch location: The scenario specifies a "switchless" HA pair, which by definition does not use cluster interconnect switches, making this verification irrelevant.
D. Crash cart location: A crash cart is a mobile tool for initial setup or console access; its location is a minor logistical convenience, not a fundamental installation requirement.
1. NetApp AFF A400 and FAS8700 Installation and Setup Instructions
Section: "Step 1: Prepare your site". This guide
applicable to systems that can be deployed in a switchless configuration
explicitly lists verifying rack space and power as primary site preparation tasks. It states
"Verify that your rack has enough space for the equipment..." and "Verify that you have the required power...".
2. NetApp Hardware Universe (hwu.netapp.com)
Specifications for DS224C Disk Shelf. The official specifications confirm that a DS224C shelf occupies 2U of rack space and details its specific power consumption requirements
underscoring the need to verify both rack units and power capacity during a site survey.
3. NetApp Universal SAS and ACP Cabling Guide
Section: "Cabling a two-node switchless cluster". This document illustrates the physical connectivity but implicitly relies on the pre-deployment assumption that rack space and power for all components have been properly planned and verified. The physical placement shown in diagrams requires available rack units.
Keep practicing
Take the free NS0-521 practice test
Ten exam-style questions with answers and explanations, plus the exam facts and study guides.
More questions
Other NS0-521 practice questions
- Question 1An engineer Is implementing a data migration scenario for a customer who has multiple FC …
- Question 2Which feature enables simultaneous snapshots of multiple LUNs In different volumes?
- Question 3A customer wants to configure an NVMe protocol-based NetApp ONTAP based storage system in…
- Question 4A customer Is deploying a new 8-node NetApp ONTAP cluster for their SAN workloads using F…
- Question 5On a two-node NetApp AFF ASA cluster, what is the recommended minimum number of paths for…
- Question 6An administrator runs the vserver nvme namespace convert-from-iun command on a NetApp ASA…