The final version of the diagram must depict that a SoftwareSession is created by some activity of a:User. Which change must be made to the Initial draft diagram to meet this requirement'
Full set: 45 questionsIn a UML Sequence Diagram, object creation is depicted by a createMessage. This message is represented by a dashed line with an open arrowhead. Crucially, the arrowhead must point directly to the head (the rectangle) of the lifeline being created. This notation signifies that the message's receipt results in the instantiation of the object represented by that lifeline. Pointing the arrow to the lifeline's "tail" (the vertical dashed line) is notationally incorrect and does not represent creation.
A. A solid line with a closed head represents a synchronous message, not a creation message.
B. The activation (execution specification) shows that the object is active; removing it does not correctly model the creation event itself.
D. The question implies a change is needed to meet the requirement, and option C describes the specific, correct notational change for object creation.
1. Object Management Group. (2017). OMG Unified Modeling Language (UML), Version 2.5.1. OMG Document Number formal/2017-12-05. Section 17.4.4.1, "Messages," p. 577 states, "A createMessage is shown as a dashed line with an open arrowhead. The createMessage target is the head of the created Lifeline."
2. Fowler, M. (2004). UML Distilled: A Brief Guide to the Standard Object Modeling Language (3rd ed.). Addison-Wesley Professional. Chapter 5, "Sequence Diagrams," discusses object creation, showing the message arrow terminating at the object's box.
Keep practicing
Take the free OMG-OCSMP-MBI300 practice test
Ten exam-style questions with answers and explanations, plus the exam facts and study guides.
More questions
Other OMG-OCSMP-MBI300 practice questions
- Question 2What is an effective and efficient approach to project modeling standards and conventions?
- Question 3Choose the correct answerWhat is the relationship between objective functions and measure…
- Question 4Choose the correct answerA system engineer has created a SysML block structure for his sy…
- Question 5Which SysML construct is used in an activity diagram to associate an actor of a use case …
- Question 6Different Block kinds are modeled using stereotypes such as «system», «subsystem» or «sof…
- Question 7Choose the correct answerWhich diagram type is commonly used to create a bill of material…