SD-WAN-ENGINEER practice question 10 of 15
An ION 3000 device at a remote branch has suffered a critical hardware failure and must be replaced via the RMA process. The administrator has…
Choose your answer, then check it against the explanation.
An ION 3000 device at a remote branch has suffered a critical hardware failure and must be replaced
via the RMA process. The administrator has received the replacement unit.
What is the correct procedure to transfer the configuration and license from the defective unit to the
replacement unit to ensure minimal downtime and retention of historical data?
Question 10 of 15
Keep practicing
Take the free SD-WAN-ENGINEER practice test
Ten exam-style questions with answers and explanations, plus the exam facts and study guides.
More questions
Other SD-WAN-ENGINEER practice questions
- Question 1When planning a software upgrade for a large fleet of ION devices, what is the recommende…
- Question 2For how many hours are Prisma SD-WAN VPN shared secrets valid?
- Question 3What is the default action for real-time media applications if link performance is poor?
- Question 4When allocating Aggregate Bandwidth for a Prisma Access "Remote Network" deployment (conn…
- Question 5An administrator is configuring a BGP peer on a Data Center ION to learn routes from the …
- Question 6During the Zero Touch Provisioning (ZTP) process of a new ION device at a branch site, wh…