SPLK-3002 practice question 10 of 15

ITSI Saved Search Scheduling is configured to use realtime_schedule = 0. Which statement is accurate about this configuration?

Full set: 90 questions
Answer options
A: If this value is set to 0, the scheduler bases its determination of the next scheduled search execution time on the current time.
B: If this value is set to 0, the scheduler bases its determination of the next scheduled search on the last search execution time. Correct answer
C: If this value is set to 0, the scheduler may skip scheduled execution periods.
D: If this value is set to 0, the scheduler might skip some execution periods to make sure that the scheduler is executing the searches running over the most recent time range.
Correct Answer:
B. If this value is set to 0, the scheduler bases its determination of the next scheduled search on the last search execution time.
Explanation

The realtimeschedule setting in savedsearches.conf controls the scheduling behavior of searches. When realtimeschedule is set to 0, the scheduler uses an "execution-time-relative" approach. This means the next scheduled run time is calculated based on the completion time of the previous search execution. This ensures that if a search run is delayed, the subsequent run starts immediately after the previous one finishes, preventing any time windows from being skipped in the data analysis.

Why Incorrect

A. The scheduler bases the next run time on the last execution time, not the current time.
C. Skipping scheduled periods is characteristic of realtimeschedule = 1 (the default), which this setting explicitly prevents.
D. This describes the behavior of realtimeschedule = 1, where the scheduler prioritizes running on the most recent time range, even if it means skipping a delayed run.

References

1. Splunk Documentation, Admin Manual, savedsearches.conf.spec, "realtimeschedule" parameter definition. The documentation specifies: "If 0, the scheduler bases the next scheduled time on the last search execution time... This is known as continuous scheduling."

2. Splunk Documentation, Admin Manual, "Configure the priority of scheduled reports". This section details the difference between realtimeschedule = 1 (schedule-relative) and realtimeschedule = 0 (execution-time-relative), confirming that 0 prevents skipping.

Scroll to Top