VCS-278 practice question 22 of 30

Weekly full backups run for clientA on master1 using a storage unit that belongs to media1. The administrator is required to retain clientA’s full backups for a period of four months. When the administrator modifies the full schedule, an option for 4 months is missing from the Retention drop- down list. How can the administrator add a four month retention?

Full set: 220 questions
Answer options
A: modify an existing retention level in the master server host properties, under Retention Periods
B: ignore the selection list and type in the desired retention period directly
C: add a new retention period in the media server host properties, under Retention Periods Correct answer
D: increase the “Image cleanup interval” in the master server host properties, under Clean-up
Correct Answer:
C. add a new retention period in the media server host properties, under Retention Periods
Scroll to Top