ASIS-CPP practice question 12 of 30
Security planning relating to threat assessment will result in the determination of the:
Full set: 230 questionsSecurity planning that incorporates a threat assessment is a fundamental part of the overall risk management process. A threat assessment identifies potential threats and evaluates their likelihood and capabilities. This information, when combined with a vulnerability assessment and impact analysis, constitutes a risk assessment. The primary outcome of this process is the determination of which risks are unacceptable and therefore require mitigation. This directly translates to establishing the appropriate "degree of security required" to protect the organization's assets across all its areas. This determination then guides the selection of specific countermeasures.
A. This is too specific. A threat assessment evaluates a wide range of potential threats (e.g., theft, fraud, natural disasters), not just the likelihood of a single type like a terrorist attack.
C. This is a subsequent tactical decision. The number of personnel is a specific countermeasure chosen after the overall required degree of security has been determined.
D. This is a subsequent administrative step. Capital expense requirements are calculated after the necessary security measures (which define the degree of security) have been identified and costed.
1. Fischer
R. J.
Halibozek
E.
& Walters
D. C. (2019). Introduction to Security (10th ed.). Butterworth-Heinemann. In the context of security surveys and risk assessment
the text explains that the process is designed to "determine the protection needs" and "make recommendations for a total security program
" which aligns with determining the degree of security required (See Chapter 5: The Security Survey).
2. ASIS International. (2012). Protection of Assets (POA). Alexandria
VA. The "Risk Management" subject area details that the risk assessment process (which includes threat assessment) is the foundation for making risk treatment decisions. These decisions establish the necessary level of protection
or degree of security
to reduce risk to an acceptable level. (See POA
"Business Principles
" Chapter: "Risk Management").
3. ASIS International. (2015). ASIS/ANSI/RIMS RA.1-2015
Risk Assessment. This standard outlines that the output of the risk assessment process is used for risk evaluation
which involves "comparing the results of risk analysis with risk criteria to determine whether the risk and/or its magnitude is acceptable or tolerable." This determination directly informs the need for risk treatment
which is synonymous with the degree of security required. (See Section 7: Risk Evaluation).
Keep practicing
Take the free ASIS-CPP practice test
Ten exam-style questions with answers and explanations, plus the exam facts and study guides.
More questions
Other ASIS-CPP practice questions
- Question 1The major advantage of zero-based budgeting is that:
- Question 2While conducting an executive protection risk assessment, the executive protection specia…
- Question 3Which of the following surveys should be conducted to determine the effectiveness of risk…
- Question 4Establishing an in-house guard service requires:
- Question 5After an information loss, which of the following three steps should be taken by an organ…
- Question 6If an employer does not utilize testing for drug impairment it should:
