Who is involved in Management Review at an operating facility? (select all that apply)
Full set: 110 questionsA Management Review is a formal, documented meeting of management to assess the effectiveness of the process safety management (PSM) system. This requires participation from individuals with direct responsibility and influence over the system's implementation and performance. This includes senior site leadership (Plant Managers), those who execute work (Engineers), those who oversee daily operations (First Line Supervisors), and those with specific PSM functional responsibility (Process Safety Representative). The goal is to ensure the system is performing as intended and to drive continual improvement.
B. Members of the community are external stakeholders. While their input is valuable through other channels, they are not part of the internal management team responsible for reviewing the PSM system's performance.
1. Center for Chemical Process Safety (CCPS). (2007). Guidelines for Risk Based Process Safety. AIChE. Chapter 19, "Management Review and Continuous Improvement," Section 19.2.1, describes the key personnel involved, stating it includes "senior site management" and "personnel with responsibility for PSM element implementation."
2. U.S. Occupational Safety and Health Administration (OSHA). (1992). Process Safety Management of Highly Hazardous Chemicals. 29 CFR 1910.119(o), "Management of Change," implies that those responsible for processes (managers, engineers, supervisors) are involved in reviews. While not a direct "Management Review" element, the principle of involving responsible parties is established.
Keep practicing
Take the free CCPSC practice test
Ten exam-style questions with answers and explanations, plus the exam facts and study guides.
More questions
Other CCPSC practice questions
- Question 1Which characteristics must a protection layer generally have to receive full independent …
- Question 2An operator repeatedly uses a handwritten startup checklist that differs from the approve…
- Question 3Which of the following are evidence that good workforce involvement exists at a facility?…
- Question 4Which information should an operating procedure include for a critical process step? (Sel…
- Question 6The Risk Based Process Safety element which is designed to verify that a process is verif…
- Question 8A management review repeatedly identifies overdue high-risk recommendations but assigns n…