What mainly affects the cooling capacity of a raised floor tile?
Question 1 discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
What is a potential disadvantage of using a hypoxic-based fire suppression system as a fire
extinguishing system?
Question 2 discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
The location of a data center is just above the Arctic Circle (North Pole). The outside air temperature
is never above 21°C/70°F.
Taking energy efficiency as the highest priority, which cooling system should you recommend?
Question 3 discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
A new network storage device in a non-standard size rack of approximately 600 kg/1,300 lbs is going
to be installed in the data center.
Are new floor loading calculations required?
Question 4 discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
When installing a raised floor, can we use a spirit level bar to level the floor?
Question 5 discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
The computer room has high levels of H2S gas contamination. What is the best option to resolve this
issue?
Question 6 discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
The air intake of the mission-critical server at the top of the rack is measuring 25 °C/77 °F.
Is this acceptable?
Question 7 discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
From the options indicated, what is the correct starting point for the raised floor installation?


Question 8 discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
A data center is located in an area where the demand for power is higher than the utility power
company is able to deliver. This results in frequent power outages and, therefore, power shedding
(scheduled/controlled power shutdown for areas) is frequently applied. The mains power is more
than 650 hours/year not available.
What type of generators should be installed?
Question 9 discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
What is the minimum requirement for the power feeds to the building for a Rated-3 data center
based on the ANSI/TIA-942 standard?
Question 10 discussion
No comments yet. Be the first to comment.
Be respectful. No spam.
Question 1 of 10
Source context
How this practice set is maintained
Maintained by the CertMage content team, this page loads questions from the exam dataset connected to its preparation resource. When an answer includes a supporting reference, it is shown with that answer so you can review the underlying vendor documentation.
Certification objectives, interfaces, and vendor services can change. Verify important details against the provider's current exam guide and documentation before your exam.