CMQ-OE practice question 1 of 35

Which of the following statements is true about using the plan-do-check-act (PDCA) methodology to make an improvement?

Full set: 348 questions
Answer options
A: It is the best way to pursue any kind of improvement.
B: The "doing” step is more important than the "checking" process in the sequence.
C: The "checking" process usually produces corrective actions.
D: The process must continue until the desired results are achieved. Correct answer
Correct Answer:
D. The process must continue until the desired results are achieved.
Explanation

The Plan-Do-Check-Act (PDCA) cycle, also known as the Deming or Shewhart cycle, is a model for continuous improvement. It is an iterative, four-stage method used for the control and continuous improvement of processes and products. The cyclical nature is fundamental; if the "Check" phase shows that the desired results have not been achieved, the cycle is repeated with necessary adjustments. This iterative process continues until the improvement goal is met, at which point the new process can be standardized in the "Act" phase.

Why Incorrect

A. While PDCA is highly versatile, stating it is the "best way" for "any" improvement is an overstatement; other methodologies like DMAIC may be more suitable for complex problems.
B. All four steps of the PDCA cycle are equally important for the methodology to be effective; de-emphasizing any step breaks the learning loop.
C. The "checking" process compares results against the plan. It can lead to corrective actions, but it can also confirm success, leading to standardization.

References

1. Moen, R., & Norman, C. (2009). Circling Back: Clearing up the Myths about the Deming Cycle and Seeing How it Evolved. The Quality Management Forum, ASQ. This paper clarifies the history and application of the PDCA cycle, emphasizing its iterative nature for learning and improvement.

2. Sokovic, M., Pavletic, D., & Pipan, K. K. (2010). Quality Improvement Methodologies–PDCA Cycle, RADAR Matrix, DMAIC and DFSS. Journal of Achievements in Materials and Manufacturing Engineering, 43(1), 476-483. (Describes PDCA as a "never-ending" iterative process for achieving improvement, see Section 2).

3. Deming, W. E. (1986). Out of the Crisis. MIT Press. The Shewhart Cycle (PDSA/PDCA) is presented as the model for learning and improvement, which implies repetition until the goal is achieved (pp. 88-89).