CTAL-TM practice question 29 of 30
Following identification of a number of costly system performance failures late in the development lifecycle, your organisation has introduced a more…
Full set: 228 questionsThe organization's goal is to evaluate the effectiveness of a new review process in achieving "phase containment" for high-impact performance defects. Phase containment is measured by comparing the phase a defect was introduced against the phase it was detected; therefore, "Phase of introduction" (a) and "Phase of detection" (e) are mandatory attributes. Additionally, to filter for defects that have the "highest impact on the technical behavior," the "Severity" (b) attribute must be captured. Together, these three attributes directly enable the required checks.
Option B: "Steps to reproduce" (c) is essential for debugging but does not provide metrics for measuring phase containment or defect impact.
Option C: "Resolution details" (d) and "Steps to reproduce" (c) are operational lifecycle attributes, not analytical metrics for evaluating phase containment.
Option D: "Resolution details" (d) tracks how a defect was fixed, which offers no data on phase containment or the defect's initial technical impact.
- ISTQB Certified Tester Advanced Level Syllabus - Test Manager, Section 4.2 (Defect Management Data and Metrics).
- Black, R. (2014). Advanced Software Testing - Vol. 2: Guide to the ISTQB Advanced Certification as an Advanced Test Manager. Rocky Nook. (Chapter on Defect Management and Phase Containment).
Keep practicing
Take the free CTAL-TM practice test
Ten exam-style questions with answers and explanations, plus the exam facts and study guides.
More questions
Other CTAL-TM practice questions
- Question 1Which of the following is an advantage of specifying test conditions at a detailed level?…
- Question 2While mining the defect database for patterns of problems in the last release, a Test Man…
- Question 3You have been seeing a high number of rejections of defect reports The developers are com…
- Question 4In an Agile project, when Is it acceptable lo not write a formal defect report when a def…
- Question 5One of your team members is struggling to identify the requirements to be tested for a pr…
- Question 7What test process is included as part of TPI Next? [1]