CTAL-TM practice question 15 of 30
You are a Test Manager at a company that develops mobile phone applications. Based on historical data in your company, you have calculated the…
Full set: 228 questionsBased on the historical metrics provided, the estimated number of defects for the new application is calculated as (50,000 LOC / 1000) 5 = 250 defects. The scenario states that exactly 250 defects were discovered at the end of system testing. Therefore, the actual number of defects found is exactly the same as the estimated number of defects. The other metrics can be calculated as follows: estimated test cases = (50,000 / 100) 4 = 2000 test cases; estimated time = 2000 15 minutes = 30,000 minutes (or 500 hours).
A: The estimated time to run all tests is 500 hours (2000 test cases 15 minutes = 30,000 minutes), not 750 hours. B: The estimated number of test cases to be executed is 2000 (50,000 LOC / 100 4), not 3000. D: The defect density is exactly the same as past applications (250 defects / 50 = 5 defects per 1000 LOC), not lower.
1. ISTQB Certified Tester Advanced Level Syllabus - Test Manager (v2012), Section 3.3.2 "Test Estimation", pp. 42-44.
2. Black, R. (2014). Advanced Software Testing - Vol. 2: Guide to the ISTQB Advanced Certification as an Advanced Test Manager. Rocky Nook. Chapter 3 (Test Estimation).
Keep practicing
Take the free CTAL-TM practice test
Ten exam-style questions with answers and explanations, plus the exam facts and study guides.
More questions
Other CTAL-TM practice questions
- Question 1Which of the following is an advantage of specifying test conditions at a detailed level?…
- Question 2While mining the defect database for patterns of problems in the last release, a Test Man…
- Question 3You have been seeing a high number of rejections of defect reports The developers are com…
- Question 4In an Agile project, when Is it acceptable lo not write a formal defect report when a def…
- Question 5One of your team members is struggling to identify the requirements to be tested for a pr…
- Question 7What test process is included as part of TPI Next? [1]