Which two practices are mandatory for a successful PowerStore OE upgrade?
Full set: 185 questionsDomain PowerStore Administration
A successful PowerStore Operating Environment (OE) upgrade mandates two key practices. First, running the upgrade pre-check (also known as a System Health Check) is a mandatory step enforced by the system. This check verifies the cluster's health and readiness, and the upgrade cannot proceed if it fails. Second, scheduling the upgrade during a planned maintenance window is a critical best practice. Although the upgrade is non-disruptive, performing it during periods of low I/O activity minimizes potential performance impact and mitigates business risk should any unforeseen issues arise. These two practices are essential for a smooth and successful upgrade process. Why Incorrect Options are Wrong
C. Disconnect all hosts: This is incorrect because PowerStore OE upgrades are designed to be Non-Disruptive Upgrades (NDU), allowing hosts to remain connected and I/O to continue throughout the process.
D. Shut down one node manually: This is incorrect because the upgrade is an automated, rolling process managed by the system. Manually shutting down a node would disrupt this procedure and likely cause a failure. References
1. Dell PowerStore: Software Upgrade Guide (Version 3.6) Reference for A: In the "Upgrade the PowerStore software" section, Step 4 states, "The system automatically runs a pre-upgrade health check... If the pre-upgrade health check fails, the upgrade process stops." This confirms the pre-check is a mandatory, system-enforced step. (Page 14) Reference for B: In the "Before you begin" section, a key planning step advises, "Dell Technologies recommends performing system software upgrades during a maintenance window when I/O is low." This is presented as a foundational best practice for a successful upgrade. (Page 9)
2. Dell PowerStore: Administration Guide (Version 3.6) Reference for C & D: The "Software upgrades" chapter describes the Non-Disruptive Upgrade (NDU) process. It states, "During the NDU process, the system remains online and I/O services continue to run." This confirms that disconnecting hosts is not required. The description of the automated, node-by-node upgrade process also confirms that manual node shutdown is not part of the procedure. (Page 179)
Keep practicing
Take the free D-PST-MN-A-01 practice test
Ten exam-style questions with answers and explanations, plus the exam facts and study guides.
More questions
Other D-PST-MN-A-01 practice questions
- Question 1What is the correct practice when connecting PowerStore to front-end switches?
- Question 2After replacing a drive, how is the rebuild process initiated in PowerStore?
- Question 3What ensures the correct replacement of a PSU in PowerStore?
- Question 4After a successful PowerStore OE upgrade, which two actions are required?
- Question 5Which step must be performed before powering off a PowerStore appliance for maintenance?
- Question 6What is the correct rollback action if a PowerStore OE upgrade introduces instability?