ECBA practice question 23 of 25
What tool can be used to determine the impact of a changed requirement on other requirements?
Full set: 210 questionsTraceability is the practice of linking requirements to other requirements, business objectives, and solution components throughout the project life cycle. When a requirement is changed, these established links are used to perform impact analysis. By tracing the relationships from the changed requirement, a business analyst can identify all other requirements, test cases, and system components that will be affected. This makes traceability the fundamental tool for understanding the ripple effect of a change.
A. Verification: Verification ensures that a requirement is well-formed, clear, and meets quality standards. It does not analyze the requirement's impact on other requirements.
C. Interview: An interview is an elicitation technique used to gather information from stakeholders. It is not a tool for systematically determining the dependencies between requirements.
D. Workshop: A workshop is a collaborative event. While impact analysis might be performed during a workshop, the workshop itself is the forum, not the underlying tool that shows the relationships.
1. International Institute of Business Analysis. (2015). A Guide to the Business Analysis Body of Knowledge (BABOK Guide) (Version 3). IIBA.
Section 5.1
Trace Requirements: The purpose of this task is "to ensure that requirements and designs at different levels are aligned to one another and to manage the effects of change to one level on related levels."
Section 5.1.1
Purpose: Explicitly states that tracing is used to support "requirements allocation and release planning
and impact analysis."
Section 5.1.5
Impact Analysis: "Traceability is used to help assess the impact of a change. Business analysts trace requirements to the affected stakeholders
solution components
or other requirements to identify all of the elements that will be affected by a proposed change."
2. Pohl
K. (2010). Requirements Engineering: Fundamentals
Principles
and Techniques. Springer.
Chapter 11
Section 11.2.2
Change Management: "Traceability information is the prerequisite for analyzing the consequences of a change request. Based on the traceability links
the requirements engineer can determine which other artifacts are affected by a change." (p. 261). DOI: https://doi.org/10.1007/978-3-642-12578-2
Keep practicing
Take the free ECBA practice test
Ten exam-style questions with answers and explanations, plus the exam facts and study guides.
More questions
Other ECBA practice questions
- Question 1What are the elements of user stories?
- Question 2If inconsistencies arise between different elicitation results, the business analyst (BA)…
- Question 3When approving requirements, conflict and issue management is an element used to assist i…
- Question 4What skill is required by a business analyst (BA) to understand how the people, processes…
- Question 5What type of knowledge equips a business analyst (BA) with understanding market forces, c…
- Question 6What tool is used by a business analyst (BA) for quality control when verifying requireme…