H13-629 practice question 24 of 35

A customer project deploys an 8-node OceanStor 9000 C Node with full front-end and back-end IB networking. The device is powered on and completes all front-end network ports. During customer front-end business switch interoperability testing, engineers will perform Oceanstor 9000 software installation and deployment. What is considered a best practice for this?

Full set: 364 questions
Answer options
A: The engineer thinks the installation PC is connected to NIC1 to complete the software deployment, so connect the installation PC to NIC1
B: Direct Deployment of Software Without Disconnecting Front End Network and All Network Nodes
C: Software Deployment Before starting, the engineer configures a temporary back-end IP address on the back end network port B3-0 of the 9000 node (connected to the installation PC)Department DHCP server
D: The installation of PC directly through the network cable connected to the OM management network switch to complete the software deployment Correct answer
Correct Answer:
D. The installation of PC directly through the network cable connected to the OM management network switch to complete the software deployment