For Huawei's network evaluation and optimization service process, which of the following is the correct service process?
Full set: 265 questionsThe correct sequence for a network evaluation and optimization project follows a logical progression. It begins with understanding the current state by collecting data and restoring the live network configuration for analysis. Based on this baseline, a target network is designed. An implementation plan is then developed to bridge the gap between the current and target states. Finally, the optimization is executed, and an acceptance test is performed to verify that the objectives have been met.
B. This option incorrectly places target network design before data collection, which is illogical as design requires baseline data.
C. This option has an illogical flow, placing implementation before configuration restoration and contains unclear phrasing.
D. This option incorrectly places target network design after the development of the implementation plan, which is out of sequence.
1. Huawei Enterprise Support, "Network Planning and Optimization Service Description". The document outlines the service workflow which generally follows the sequence of Assessment (including data collection), Planning and Design, Implementation, and Verification. This aligns with the logical flow presented in option A. (Specific document ID: Can vary, but the process is standard in Huawei's service descriptions for NPO).
2. Huawei Learning, "HCIP-Datacom-Network Automation Developer V1.0 Course Material". Module on Network O&M and Automation discusses the lifecycle of network management, which starts with data collection and analysis before any design or implementation changes are planned. (Section: Network O&M Lifecycle).
Keep practicing
Take the free H19-321 practice test
Ten exam-style questions with answers and explanations, plus the exam facts and study guides.
More questions
Other H19-321 practice questions
- Question 1Huawei's special maintenance support services include?
- Question 2Huawei Data Center L1 Integration Service quotation includes (multiple choice)
- Question 3What methods does UniSTAR SCT Configurator support for maintenance service quotation? (Mu…
- Question 4What is not the key point of data center L1 total integration service expansion?
- Question 5For non-distributed products, which of the following customer support service products is…
- Question 6Typical application scenarios for SmArtMigrAtion to achieve data migration are ( (multipl…