ICGB practice question 28 of 30

The data on SPC charts are typically constructed such that they have the most recent data point on the right hand side.

Full set: 200 questions
Answer options
A: True Correct answer
B: False
Correct Answer:
A. True
Explanation

The statement is True. Statistical Process Control (SPC) charts are a specific type of time-series plot. By convention, the horizontal axis (x-axis) represents time or the sequence of data collection (e.g., sample number, hour, day). Time progresses from left to right along this axis. Consequently, each new data point is added to the right of the previous one, making the most recent data point the one on the far right-hand side of the chart. This convention is crucial for real-time process monitoring.

Why Incorrect

B. False: This is incorrect. Plotting the most recent data anywhere else (e.g., on the left) would violate the universal convention for time-series graphs and make the chart confusing and difficult to interpret for trends, shifts, or patterns.

References

1. Montgomery, D. C. (2013). Introduction to statistical quality control (7th ed.). John Wiley & Sons. Chapter 4, Section 4-2, "Control Charts," describes the basic principles, stating, "The chart is a graphical display of a quality characteristic that has been measured or computed from a sample versus the sample number or time." All examples (e.g., Figure 4-1) show time/sample number increasing from left to right.

2. MIT OpenCourseWare. (2004). 15.062 Data Mining. Spring 2004. Session 11: Time Series, Part 1. The lecture notes and slides establish the fundamental structure of a time series plot with time on the x-axis, progressing chronologically from left to right.

3. NIST/SEMATECH. (n.d.). e-Handbook of Statistical Methods. Section 6.3.1, "What are Control Charts?". The handbook states, "The control chart is a graph used to study how a process changes over time. Data are plotted in time order." The accompanying example charts all follow this left-to-right time convention.

Scroll to Top