PECB certification preparation
ISO-45001-LEAD-AUDITOR Practice Questions
Practice exam-style questions, check your answers, and review explanations and source references where they are available.
- Exam
- ISO-45001-LEAD-AUDITOR
- Provider
- PECB
- Full set
- 43 questions
- Last Update Check
Do not let the complexities of the ISO-45001-LEAD-AUDITOR test hold you back from advancing your career. Cert Mage equips you with a robust ISO-45001-LEAD-AUDITOR question bank carefully designed to bridge any gaps in your knowledge. Get a true feel for the digital testing format by running through our highly responsive exam simulator. We highly recommend that all candidates begin with our free ISO-45001-LEAD-AUDITOR sample questions to evaluate their current readiness. Once you are prepared to dive deeper, our premium ISO-45001-LEAD-AUDITOR exam questions and detailed practice questions will serve as your ultimate study companion.
Question 1 discussion
Wash-it-up is an organization that provides window cleaning services for the industrial sector. It has been certified t ISO 45001 for some time and has appointed a new OHS Manager. The audit plan during a surveillance audit includes the improvement actions and the auditor asks to see the most recent management review meeting minutes. surveillance audit includes the Improvement actions and the auditor asks to see the most recent management review meeting minutes. Which six of the statements would represent output audit evidence for the management review?
Question 2 discussion
On behalf of a certification body, you are conducting a combined audit of Shelf-Fit. The organization designs, manufacturing install interiors for retail stores. They employ subcontractors for the installation work. Representing the ISO 45001 audit, you ask the Purchase Manager about the identification of health and safety hazards for contractors on site. Having previously reviewed the hazards list (HZD-21/11 Rev.3), you found that various health and safety hazards were listed but not were associated with contractor working on-site. When you ask about the use of contractors, the response is, ‘’We know that contractors use chemicals, such as glues, paints and vanishes. We trust them since they know more than we do about the safe handling of such issues’’. The auditor made the same enquiry to an accompanying member of the health and safety team and was told that chemical safety had never been a problem with the installation process.
Question 3 discussion
Question 4 discussion
What does ISO 45001 say are the hazards that have to be considered when planning a health and safety management system? Select the ONE best
Question 5 discussion
In the ISO 45001 health and safety management system, what is 'documented information'? Select the ONE best answer
Question 6 discussion
DRAG DROP During an internal audit of an OHSMS, what evidence would the auditor look for to demonstrate conformity to ISO 45001? Match each item with the correct ISO 45001 clause number.
Question 7 discussion
DRAG DROP Match the correct responsibility with each participant of a second-party audit:
Question 8 discussion
DRAG DROP A well-known fast-food organisation (ISO 45001 certified) contracts young people to deliver orders; last week one of them died in a street accident riding for the first time a new motorbike provided by the organisation. You will lead the recertification audit in two weeks, and you plan to prepare a checklist to investigate this incident. The following are potential questions you might ask; match them to the related ISO 45001 clause/subclause.
Question 9 discussion
An audit team leader arrives at a steel fabrication organisation that manufactures stairways to carry out a Stage2 certification audit. At a meeting with the OHSMS Manager, she is told that they have won their biggest contact from a construction organization to manufacture and install stairways. During the audit, a team member found that several employees had suffered hand injuries over several months due to handrail welds not being property polished. The OHSMS Manager blames the new employees they had to take on because of the big contract. The auditor raises a nonconformance against clause 10.2 erf ISO 45001. In relation to the nonconformity raised by the auditor and in line with the policy of the certification body, the audit team raise improvement opportunities in the audit report. Which three of the options would represent acceptance opportunities for improvement in the report?
Question 10 discussion
Source context
How this practice set is maintained
Maintained by the CertMage content team, this page loads questions from the exam dataset connected to its preparation resource. When an answer includes a supporting reference, it is shown with that answer so you can review the underlying vendor documentation.
Certification objectives, interfaces, and vendor services can change. Verify important details against the provider's current exam guide and documentation before your exam.



