LEED-AP-HOMES practice question 28 of 35
A builder plans to build two semi-detached residential homes at a rural lot he just bought, where the municipal water system cannot reach. The homes…
Choose your answer, then check it against the explanation.
A builder plans to build two semi-detached residential homes at a rural lot he just bought, where the
municipal water system cannot reach. The homes will use well water dug on site. The builder would
like to build the two units as LEED certified homes. To meet the prerequisite of Water Efficiency
domain in LEED Homes, what should the builder do?
Question 28 of 35
Keep practicing
Take the free LEED-AP-HOMES practice test
Ten exam-style questions with answers and explanations, plus the exam facts and study guides.
More questions
Other LEED-AP-HOMES practice questions
- Question 1For a typical single-family home, plumbing fixtures may account for what fraction of the …
- Question 2A LEED for Homes project is located in an area heavily infested with termites. A project …
- Question 3A project has a 2,500 ft² (232 m²) roof, 200 ft² (18.58 m²) uncovered patio, 100 ft² (9 m…
- Question 4Who of the following may submit to Green Business Certification Inc. a LEED for Homes pro…
- Question 5To comply with Materials and Resources Prerequisite: Certified Tropical Wood, all wood in…
- Question 6A project team targets concrete as a material to receive Environmentally Preferable Produ…
