LEED-AP-HOMES practice question 17 of 35

Looking at the attached table, a project team is aiming for three points in Water Efficiency Credit, Outdoor Water Use. The site contains a total of…

Choose your answer, then check it against the explanation.

Looking at the attached table, a project team is aiming for three points in Water Efficiency Credit, Outdoor Water Use. The site contains a total of 57,500 ft² (5,342 m²) of softscape. If the plan has 8,000 ft² (743 m²) of turf grass, what is the minimum area of native or adapted landscape required to achieve the desired three points for this credit? Turf grass area Native or adapted plant area Points 25% 1 50% 2 75% 3 75% 4
Answer options
Question 17 of 35

Keep practicing

Take the free LEED-AP-HOMES practice test