LEED-AP-OM practice question 23 of 25
A building owner upgrades the building automation system (BAS) to allow programmable load control. Which of the following credits can be pursued because of the upgrade?
Full set: 168 questionsDemand response is a voluntary program that encourages building owners to reduce their electricity use during peak periods or shift it to off-peak times. The upgraded BAS can enable the building owner to participate in demand response programs by allowing programmable load control, which can adjust the operation of HVAC, lighting, and other systems based on the demand response signals. This can help reduce the stress on the grid, lower the electricity costs, and earn LEED points.
Reference:
Part 2 of current page talks about the Energy and Atmosphere Credit, Demand Response1. Guide to the LEED AP Operations and Maintenance (O+M) Exam by Michelle Cottrell, pages 97-98.
Keep practicing
Take the free LEED-AP-OM practice test
Ten exam-style questions with answers and explanations, plus the exam facts and study guides.
More questions
Other LEED-AP-OM practice questions
- Question 1For an office building with few visitors, which of the following actions must the project…
- Question 2Which of the following is the most appropriate use of untreated stormwater?
- Question 3How is the energy baseline determined in Minimum Energy Performance if the building type …
- Question 4An ASHRAE Level 1 walkthrough analysis contributes to what prerequisite or credit?
- Question 5Under Indoor Environmental Quality Credit, Interior Lighting, outlet powered task lightin…
- Question 6A 1,500 ft2 (139 m2) mobile home is built in the downtown area of a major city. 90% of th…