LEED-AP-OM practice question 9 of 25
The minimum amount of renovation or new construction work required to qualify for Materials and Resources Credit, Purchasing - Facility Maintenance and Renovations is
Full set: 168 questionsCorrect Answer:
C. determined by the project team as there is no minimum requirement
Explanation
For the Materials and Resources Credit, Purchasing - Facility Maintenance and Renovations, there is no specified minimum amount of renovation or new construction work required. The project team determines what qualifies for this credit based on the scope of their project.
Reference: The LEED v4.1 O+M reference guide does not specify a minimum renovation requirement for this credit, allowing the project team to define the scope of work that meets the intent of the credit1.
Keep practicing
Take the free LEED-AP-OM practice test
Ten exam-style questions with answers and explanations, plus the exam facts and study guides.
More questions
Other LEED-AP-OM practice questions
- Question 1For an office building with few visitors, which of the following actions must the project…
- Question 2Which of the following is the most appropriate use of untreated stormwater?
- Question 3How is the energy baseline determined in Minimum Energy Performance if the building type …
- Question 4An ASHRAE Level 1 walkthrough analysis contributes to what prerequisite or credit?
- Question 5Under Indoor Environmental Quality Credit, Interior Lighting, outlet powered task lightin…
- Question 6A 1,500 ft2 (139 m2) mobile home is built in the downtown area of a major city. 90% of th…
