LEED-AP-OM practice question 9 of 25

The minimum amount of renovation or new construction work required to qualify for Materials and Resources Credit, Purchasing - Facility Maintenance and Renovations is

Full set: 168 questions
Answer options
A: correlated to an increase of the floor area by at least 5%
B: determined based upon flush-out procedure requirements
C: determined by the project team as there is no minimum requirement Correct answer
D: correlated to alterations that include construction activity by more than one trade
Correct Answer:
C. determined by the project team as there is no minimum requirement
Explanation

For the Materials and Resources Credit, Purchasing - Facility Maintenance and Renovations, there is no specified minimum amount of renovation or new construction work required. The project team determines what qualifies for this credit based on the scope of their project.
Reference: The LEED v4.1 O+M reference guide does not specify a minimum renovation requirement for this credit, allowing the project team to define the scope of work that meets the intent of the credit1.