M3-123 practice question 7 of 15
The manufacturing order processing flow includes the following four tasks: 1. Production receipt 2. Issue material to manufacturing order 3. Create manufacturing order 4. Report operations Which one of the following is the correct order in which those tasks should be performed?
Full set: 73 questionsThe standard manufacturing order (MO) processing flow in Infor M3 follows a logical production sequence. The process must begin with the creation of a manufacturing order (3), which serves as the authorization to produce a specific item. Once the order exists, the required materials are issued (2) from inventory to the shop floor. As work is performed, operations are reported (4) to track progress, labor, and machine time. The final step is the production receipt (1), where the finished goods are formally received into inventory, making them available for sale or further use.
A. Reporting operations (4) cannot be done before a manufacturing order (3) is created to report against.
B. Issuing material (2) requires an existing manufacturing order (3) to which the components can be allocated.
C. Production receipt (1) is the final step; it cannot occur before the order is created and work is performed.
1. Infor CloudSuite M3 Manufacturing Order Management User Guide: In the section titled "Basic Manufacturing Order Flow," the documentation outlines the standard process sequence. It begins with creating an MO (using program PMS100), followed by material allocation and issuing, then reporting on operations (PMS070), and concludes with reporting the receipt of the finished product (PMS050). This directly supports the 3, 2, 4, 1 sequence.
2. Monk, E., & Wagner, B. (2013). Enterprise Resource Planning (4th ed.). Cengage Learning. This textbook, widely used in university ERP courses, describes the standard production process flow in Chapter 6, "Production and Supply Chain Management." The flow is consistently presented as: 1. Authorize Production (Create Order), 2. Issue Raw Materials, 3. Perform Production Work (Report Operations), 4. Receive Finished Goods. This fundamental ERP principle is embodied in the Infor M3 system.
Keep practicing
Take the free M3-123 practice test
Ten exam-style questions with answers and explanations, plus the exam facts and study guides.
More questions
Other M3-123 practice questions
- Question 1Which one of the following describes a payment type when there is no invoice to match aga…
- Question 2You need to retrieve the purchase price for purchase costing. Which two of the following …
- Question 3Which one of the following items describes what happens first when the account allocation…
- Question 4Which of the following describe account groups in Infor M3?
- Question 5You are creating a supplier bank account. Which one of the following types of bank accoun…
- Question 6You have an invoice where the invoiced quantity is not equal to the received quantity. Yo…